I'm building a boat to a design by Paul Fisher of Selway Fisher Design in the UK. The design is called "Able" and her vital statistics are: overall length 4.88m (16ft), beam 2m (6ft 6in) and design weight is 360kg (790lbs). You can read more about this design at http://www.selway-fisher.com/OtherDB.htm#KANE.

I intend to procede more slowly with this boat than I did with either of my other boat building projects (see links below on the right). This is, after all, a hobby and there are other things to do. So, updates to this blog might happen once every week or two. Come back and see.

If you would like to contact me please Click to Send me Email

Sunday, 19 May 2013

The Hinge for the Main Mast

I have been making the parts of the hinge for the main mast. These are three 316 grade stainless steel plates, one aluminium packing piece and a couple of pins. Machining stainless steel can be a problem because it easily work hardens. Any rubbing, rather than cutting, quickly raises the temperature causing hardening. I had the stainless supplier cut the plates to shape for me on a CNC plasma cutting machine. This left me with the job of accurately drilling a number of different sized holes through the plates. Fortunately I have a small CNC milling machine to do this job. Here is a photo showing the aluminium packing piece being cut; the white surface is powder coating on the scrap aluminium being reused.


Here are the two identical plates for the upper part of the hinge having the holes cut. Note the clamps and bolts through the first couple of holes to keep the plates together and stop them moving relative to one another. Note the coolant stream to prevent both cutter and material heating up and also to carry away the chips.


Here are the completed parts, upper hinge plates (4mm thick) on the left and right, lower hinge plate (6mm thick) left of the steel rule and the white packing piece (6.35mm thick).
 

This next photo shows the parts assembled. The notch in the corner of the lower hinge plate hits against the pin which passes through the two upper plates to provide a positive stop when the mast is vertical. The packing plate (white) is slightly thicker than the lower hinge plate to ensure that the hinge doesn't bind.


The next two photos shows the hinge clamped to the top of the lower part of the mast its up and down positions. In the up position there is a locking pin (just below the lower bolt in the upper hinge), this will probably only be used when the mast is pushed up until the forestay is tightened and when the forestay is released to lower the mast.


The lower part of the mast is still square at this stage so that the lower hinge plate can be used as a template to drill the five dowel holes. Having the mast square will also help with cutting the slot in the mast for the hinge plate. Doing either of these jobs on a circular mast would be difficult to get right and the position of the hinge plate in the mast is critical.

The plate will be glued into the mast with epoxy after roughening the surface of the steel. Hardwood dowels will reinforce the glue joint. For some reason that I can't explain I have put 5 dowels through the lower plate and four through the upper plate! Maybe I decided that the hinge pin which passes through the upper part of the mast provided some additional support.

It's now a day later and I have fitted the lower hinge plate into the lower part of the mast. Here it is in place in the boat. The mast still needs to be shaped (square to circle) and I am pleased that I drilled the holes and cut the slot while it was still square. I will do the same with the upper part of the mast.

 
 

Wednesday, 8 May 2013

The Centreboard and its Lifting Tackle

After returning from my break I turned my attention to some of the steel parts for the boat. The biggest item is the centreboard (CB). I drew the CB using a CAD package on my PC and did some phone research to find out how and where I could get it cut. A few calls led me to Midway Metals at Yatala in Brisbane. I emailed a DXF file (standard drawing interchange file) to them on Tuesday evening, received a quote on Wednesday morning, I accepted the quote and picked up the CB on Thursday - pretty good service. The CB is cut from 316 grade stainless steel, 12mm thick and it weighs 48 Kg. The CB cost $380. The cutting was done on a "plasma" cutter and unfortunately plasma cutters can't do small holes. I had to take it to a machine shop to get the 2 holes drilled and this cost $80, expensive holes!

While I was drawing the CB I made a sketch of it in 3 positions with the lifting line. Here it is:

 
It is hard to see the detail so click on the image to get it enlarged. There are 2 dimensions for each position of the CB. One gives the moment arm of the dead weight of the CB, the other gives the moment arm of the lifting force. The moment is the force or dead weight multiplied by the moment arm and the moments about the pivot point must balance. The lifting force needed in each position id shown in the table below.
 
CB position Lift moment arm Dead weight arm Lift force Kg
Down 450 75 8.0
Middle 597 460 37.0
Up 509 575 54.2
 
The CB in my Welsford Navigator is 2/3rds the weight of the Able CB and it is quite difficult to lift. This made me wonder whether lifting the Able one with block and tackle was a practical proposition - maybe the winch called for by the plans is a better way to go. I decided to make a test rig and try the tackle approach.
 
Here is the CB mounted in the test rig. The pivot point and lifting "eye" are located as they would be in the boat.
 
 
I tried the 5:1 tackle that lifts the CB in my Navigator(the boat on the trailer) but it didn't work very well. It did lift the CB but I had to pull very hard to provide the 54 Kg lifting force as the CB approaches the up position. Theoretically the 5:1 tackle should only need about 11 Kg on the tail of the rope to pull 54 Kg. I guess that I had to apply 25 to 30 Kg to lift the CB. Most of the force applied to the tackle is used to overcome friction in the small (20mm) sheaves.
 
I searched through my boxes of old boat bits and found some blocks with larger sheaves and cobbled together another 5:1 tackle and tried this. The result was much better but still getting close to 20 Kg. Here is a photo of the CB in the up position.

 
Last photo shows a close up of the 5:1 tackle, 3 sheaves at the fixed end and 2 at the moving end. A tidy version of this would probably do the job but I will look for 2 triple blocks with ball bearing sheaves to get a 6:1 purchase. Hopefully this will dramatically reduce the friction forces which increase as more sheaves are added and also increase as the gets bigger.

 
I will also look further into the suggested worm drive winch. This is what the small Dutton Lainson winch, suggested on the plans, looks like.
 
 
 
The body of the winch is 140 mm high and the end of the handle is 300 mm above the base. This winch has a 30:1 ratio and a drum 40mm in diameter. To pull in the lifting line 900 mm (CB fully down to fully up) would need over 200 turns of the handle! It would undoubtedly work but it is ugly and, to me, 200 turns of the handle is 10x too many.
 

Thursday, 9 May 2013

Problem Solved

I bought a pair of triple blocks with 30mm diameter ball bearing sheaves. Using these gives me a 6:1 purchase so in theory the force needed on the tail of the tackle is only about 9 Kg (ignoring friction effects). Here is a photo of the new blocks in place in my test rig.
 
 
 I pulled on the tail of the tackle with my spring balance  and raised the CB completely with less than 12 Kg (that's the limit of my balance). Using one hand (gloved) I could raise the CB completely in 6 pulls. So, the ball bearing blocks make a huge difference by reducing the friction in the tackle.
 
I didn't like the winch and now have a solution to the problem of raising the CB.
 
Back to putting epoxy fillets in all the corners inside the hull.

 


Friday, 19 April 2013

Two Weeks Break!

I'm writing this in the middle of a two week break from boatbuilding. Last week I went sailing with a group of guys from the Wooden Boat Association and had a great time. Tomorrow I'm off to Perth for a week visiting relatives and a friend.

The last thing I did on the boat was to make a template for the foredeck. It is made up off strips of scrap ply fixed together with hot melt glue. It is strong enough to withstand the pulling and pushing to get it off and on over the samson post. It remains to be seen whether the 9mm ply deck will be flexible enough to put into place. Here is a photo of the finished template.


As it stands the interior of the boat is almost complete up to the level of the seat tops. There are 3 pieces of timber to glue in place, some cleanup to do and a lot of epoxy fillets to put in/ Once that is done I will start painting the inside of the various compartments before putting the tops on. Here are 3 photos of the interior.



Friday, 12 April 2013

Foredeck Beams and Bowsprit

I have been cleaning up the beams that support the foredeck and gluing them in place. As this progresses it becomes harder to do anything in the space below the beams. I put epoxy fillets along all the plank seams and added the gussets to support the base of the samson post before fixing the beams. Here is a photo


There are still two fore and aft beams to add where the notches can be seen.

While working on these beams I have been thinking about the bowsprit. Today I made one up according to the plans, here it is.




I'm not sure that I like the way it is attached although I think it will work OK. An alternative approach would be to cut off the top of the stem and fit a longer bowsprit through a fixture on the stem head with the aft end of the bowsprit held in a block on the foredeck. Taking the bowsprit back as far as the samson post would need the samson post to be higher and this would look really strange. I will leave the bowsprit shown above in place and keep thinking about it.

Sunday, 7 April 2013

Folding Mast.


I am keen on the idea of a folding mast on my Able. The advantage I see with this is a dramatically reduced time to rig and pack up the boat. Here is a photo of a boat with the sort of folding mast that I envisage.



Nice boat isn't it, it is a Newport Lobster Boat belonging to Dave McCulloch.

To rig the boat the mast is pushed up into the vertical position and the forestay attached to the end of the bowsprit. The rest of the rigging, side stays, halyards, etc is already attached. The sail is unbundled and can be raised immediately. To pack up the sail is lowered and bundled around the boom. The forestay can now be released and the mast lowered and the boat is ready to go home. I expect the whole process or rigging or packing up to take 15 or 20 minutes instead of an hour or more.

For this idea to work the lower part of the mast has to be firmly supported so that it can't move. This can be done in several ways. It could be built in as a permanent part of the boat - this is probably the easiest solution but if it ever had to replaced some serious rebuilding of the boat would be involved. Another approach could be to step the mast on the keel and support it at deck level in a partner attached to the rear face of the large forward bulkhead. To do this the bulkhead would have to be moved forwards to maintain the correct position of the mast; the original design has the mast just in front of the bulkhead. Moving the bulkhead forward would reduce the volume of the forward buoyancy compartment and so this approach was abandoned. The approach adopted involves putting the base of the mast in a box inside the forward compartment. To keep the correct position of the mast the bulkhead has to move towards the stern by a few millimetres. As the top of the box would be open, allowing water to get in, it has to be sealed from the buoyancy compartment and drained into the cockpit.

To try and work out how this could be achieved I made a template showing the position of the mast and some of the supporting structure. Here it is in position behind the template for the bulkhead.


The photo below shows a closer view of the template, click on the photo to enlarge it.


At the top of the template you can see a horizontal pencil line across the 3 red lines. The intersection of the pencil line and the middle red line is where the pivot pin that supports the mast in the original design should be. This point has to be maintained on the centreline of the mast.

The 3 red lines on the template show the faces and centre of the mast at the correct rake (95 in 2000 or 38 in 800). Either side of the mast at deck level are the 65 x 25 deck beams.

The sides of the box will be 9 mm ply and the front and back will be 25 x 80. The geometry of the joints where the mast goes through the deck is going to be a bit tricky. The two fore and aft timbers that support the deck will need to be thicker than the design calls for because they go past the inner stem and samson post (65mm wide) and then come to the mast where they will have to be notched around the box (80mm for the mast and 2 x 9mm ply sides.

I will put a pad on top of the keel to spread the load from the mast a bit, the box sides will come down past it to meet the hull, all voids filled with epoxy!

In the next photo the finished bulkhead has been glued in place and the template showing the mast position put back in place. The block that the mast will stand on is visible at the bottom of the template.


The 2 longitudinal deck support beams have been fitted, below. The samson post is visible between them and the forward cross beam is in place. Note that the deck is cambered and the curve on the top of this beam is not the same as the curve across the top of the bulkhead, this is a trap for the unwary! None of these timbers has been glued in place yet.


The next photo shows all the framework in place but not glued. I made a dummy mast out of scrap ply with a taper representing the rake of the mast (95 mm in 2000 mm)  and wedged it in place in the the mast supporting box. The spirit level shows that the mast slopes backwards at the correct  angle. Yippee!


Here is a view ot the bottom part of the mast support box.


After making a start on gluing the pieces of the framework in place, this will take a while because each lot of epoxt has to set before the next joints can be glued, I made a startof the forward seat fronts. The template can be seen on the fqar side of the boat and the finished, but not glued, nearn side seat front is in place with its supporting stringers.


At this point there is a lot of gluing to be done, of parts that already made, and I have to go buy more plywood and Oregon (Douglas Fir) because I have completely run out of both.

Saturday, 30 March 2013

More on Bulkheads

I seem to be stuck on bulkheads but over the last couple of days the inside of the boat has started to come together. Making up the bulkheads on the bench seened to take a long time but once they are complete putting them in the boat has been very quick and easy. Putting the bare plywood bulkhead into the boat and then adding all the stringers to them would have been more difficult and I think it would have taken longer.

This is what the bulkhead looks like when it is being glued together on the bench.

 
Here it has been cleaned up and is in position in the boat for the glue lines to be marked out and taped. I was sceptical about the tape but it really does help to keep the epoxy under control.
 
 
 
This is what the tape looks like. The next step is to prime the glue line and the edges of the bulkhead with unthickened epoxy and leave it to soak in for a while. Then thickened epoxy is applied liberally between the lines of tape. What I'm trying to do is to ensure that the gap between the hull and the bulkhead is full of epoxy.
 


 
The next photo shows two of the four bulkheads in place. These bulkheads support the cross seat and brace the centre board case.
 
 
 

Today the second pair of bulkheads were installed in the boat. In between cleaning them up, taping and gluing them in I made templates for the aft side seat fronts and cut the ply panels. This last photo shows the state of play at the end of today's work.
 
 
There will have to be a pause in procedings because I have run out of ply and need to buy more (that can't be done at Easter!). Until then there is the supporting beams for the aft side seat tops to work on, more than enough to keep me busy until the shops open again.
 


Sunday, 24 March 2013

Ballast Tank Bulkheads

Before I get on to the ballast tanks here is a photo of the box that supports the mizzen mast. It is now glued in place but still has to have epoxy fillets run around the joints. The box is sealed at the bottom and any water that gets into it drains out through a hole in the transom.



I seem to be making very slow progress on the ballast tank bulkheads. There are two short ones at either end of the centreboard case and two taller ones that support the cross thwart. All four bulkheads have stringers glued to them to support the tops of the ballast tank compartments. When the bulkheads are in place the stringers have to be level so the top of the tank is flat. I decided to fit the stringers to the bulkheads on the bench because this is much easier and cleaner that glueing them to the bulkheads in the boat. The measuring and marking the position of the stringers has to be done in the boat and is awkward to do.

Here is a photo showing the two short bulkheads, one glued in place the other waining for the glue to set. The tops of these two bulkheads have to be level across the boat and also fore and aft. The stringers on the two intermediate bulkheads also have to be at the same level and so they can only be positioned when the first two are in place.

 
Here is the template for the big bulkhead that forms the forward buoyance and storage compartment. The template is made from the building mould with short pieces of scrap ply hot melt glued to it to get the exact shape. I cut the centre out of the mould to lighten it.